• KW-2 – A1 – 28.07.2015R-page-001
  • KW-3 – A1 – 28.07.2015R-page-001
  • KW-6 – A1 – 28.07.2015R-page-001
  • K10_-_A0_-_12.04.15_-_OST-page-001
  • K9_-_A1_-_12.04.15_-_OST-page-001
  • K8_-_A3_-_12.04.15_-_OST-page-001

Project of silvers shed and modernization of boiler together with social-administrative building in Piecki